We all know that the main
purpose of solar panels is all about generating electricity for home and
commercial purposes. You will install the panels on top of the rooftops for
getting maximum sunlight. And this sunlight will help you to generate a high
amount of electricity from the system. For the successful installation of the Sunnova energy corporation solar
panel system, let’ have a quick discussion in the step by step tutorial:
Step
No 1: Mounting the Installation
The first step of the
process is fixing the Launchpad solar city
mounts which are used for supporting the solar panels. You can either perform
the flush mount or the roof-ground mounts based on your requirements. This base
structure helps provide support and great sturdiness. You should be giving
extra care to the PV panels for long-lasting usage. If the mounting structure
has been slightly tilted, you should fix the tilting angle as in between 18 to
36 degrees.
Step
No 2: Installation of Solar Panels
The second step is about
the fixing of the Trina solar panels through the
mounting structure. Tighten up the bolts and nuts carefully. This will enable
the solar panel to stay for long years and has a highly durable nature.
Step
No 3: Perform the Electrical Wiring
Coming step is about the
electrical wiring. Universal Connectors such as MC4 are best to use at the time
of wiring. This is because all these connectors are yet connected with the
various solar panels. You can connect these panels' electricity in the form of
series. Series are divided into two main types such as series connection and parallel
connection.
Step
No 4: Connecting System to Solar Inverter
Connect the solar system
with the solar inverter. The positive wire of the solar panel will be connected
with the Positive terminal of your inverter and the negative wire of the solar
panel will be connected with the negative terminal. You will connect the solar
inverter with the solar battery and then grind input for producing electricity.
Step
No 5: Connecting Solar Inverter and Solar Battery
Now you will be
connecting the solar battery and solar inverter. Connect the positive
wire of the solar panel with the Positive terminal of your inverter and the
negative wire of the solar panel will be connected with the negative terminal. The
battery is also required within the off-grid solar system for the storage of electricity
backup.
Step
No 6: Connecting Solar Inverter to the Grid
Next, you have to connect
the Jinko solar panels inverter
with the grid. For making this connection, you can use a normal plug for
connecting the main power of the switchboard. Output wire is then connected
with the electric board from where the supply of electricity is given to the
whole home.
Step
No 7: Starting the Solar Inverter
Once you are done with
the connections and electrical wiring, you should turn on the inverter switch
which is the main switch of your home. Most of the solar inverters are having digital
display with which you can see the stats related to the generation and the usage
of the entire solar unit.